Dangerous voltage!
• Before carrying out any repair work, first switch off the AC
circuit breaker between the inverter and power grid, and then
the DC switch.
• After switching off the AC circuit breaker and the DC switch,
wait a minimum of 5 minutes before starting any
maintenance or repair work.
Unauthorised repairs!
• Following the elimination of any faults, the inverter should
be fully functional once more. Should any repairs be
required, please contact a local authorised service centre.
• The internal components of the inverter must NOT be
opened without the relevant authorisation. Shenzhen
SOFARSOLAR Co., Ltd. assumes no responsibility for any
resulting losses or defects.