EasyManua.ls Logo

Sofarsolar SOFAR 60KTLX-G3 - Page 9

Sofarsolar SOFAR 60KTLX-G3
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SOFAR 60-80KTLX-G3 User manual
Copyright © Shenzhen SOFARSOLAR Co., Ltd.
3
Transportation Requirement
Inverter is in the good electrical and physical condition when it ship out from
factory. During transport, inverter must be placed in its original package or other
proper package. Transportation company should responsible for any damage during
transport period.
If you find any packing problems that may cause the damage of inverter or any
visible damage, please notice the responsible transportation company immediately.
You can ask your installer or SOFARSOLAR for help is necessary.
Electrical Connection
Please comply with all the current electrical regulations about accident prevention
in dealing with the current inverter.
Before the electrical connection, use opaque material to cover the PV
modules or disconnect PV string DC switch. PV arrays will produce
dangerous voltage if it is exposure under sun.
Danger
All operation must accomplish by certified electrical engineer
Must be trained;
Completely read the manual operation and understand all
information.
Warming
Must get permission by local utility company before connecting to
grid and the connection must be done by certified electrical
engineers.
Attention

Related product manuals