Make sure to use power optimizers that have the required output conductor length.
Completely shaded modules may cause their power optimizers to temporarily shut
down. This will not affect the performance of the other power optimizers in the
string, as long as the minimum number of unshaded power optimizers connected in
a string of modules is met. If under typical conditions fewer than the minimum
power optimizers are connected to unshaded modules, add more power optimizers
to the string.
To allow for heat dissipation, maintain clearance as specified below.
Figure 5: Power optimizer clearance
When installing modules in a confined space, for example, if installing Building-
integrated photovoltaic (BIPV) modules, ventilation measures may be needed to
ensure the power optimizers are not be exposed to temperatures outside their
specifications.
Chapter 2: Installing the Power Optimizer 21
Three Phase System MAN-01-00507-4.2

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SolarEdge SE3K-RWB and is the answer not in the manual?

SolarEdge SE3K-RWB Specifications

General IconGeneral
BrandSolarEdge
ModelSE3K-RWB
CategoryInverter
LanguageEnglish

Related product manuals