Appendix D: SafeDC
The SolarEdge inverters are certified for compliance with the following standards as
disconnection devices for PV generators, meaning that they can replace a DC
disconnect:
IEC 60947-3:1999 + Corrigendum: 1999 + A1:2001 + Corrigendum 1:2001 + A2:2005;
DIN EN 60947-3
VDE 0660-107:2006-03
IEC 60364-7-712:2002-05
DIN VDE 0100-712:2006-06.
In compliance with these standards, follow the instructions below to disconnect DC
power:
1.
Move the inverter ON/OFF switch to OFF (0).
and wait until the LCD indicates that the DC voltage is safe (<50V), or wait five
minutes before continuing to the next step.
WARNING!
If you cannot see the inverter panel, or if a malfunction is indicated on the
LCD panel, wait for five minutes for the input capacitors to discharge.
2. Disconnect the AC to the inverter by turning OFF the circuit breakers on the
distribution panel.
Three Phase System MAN-01-00507-4.2
88 Appendix D: SafeDC™