EasyManua.ls Logo

SolaX Power X3-ULTRA - 5 Preparation before Installation; Selection of Installation Location; Environment Requirement

SolaX Power X3-ULTRA
171 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
24
5 Preparation before Installation
5.1 Selection of Installation Location
The installation location selected for the inverter is quite critical in the aspect of the
guarantee of machine safety, service life and performance. It has the IP66 ingress
protection, which allows it to be installed outdoor. The installation position shall be
convenient for wiring connection, operation and maintenance.
5.1.1 Environment Requirement
Make sure the installation site meets the following conditions:
The ambient temperature: -35
to +60
;
The relative humidity shall be between 0-100%RH;
Do not install the inverter in the areas where the altitude exceeds 3000 m;
Install the inverter in a well-ventilated environment for heat dissipation; You are
recommended to install an awning over it if the inverter is installed on a support
outdoor;
Do not install the inverter in areas with flammable, explosive and corrosive
materials or near antenna;
Avoid direct sunlight, rain exposure and snow laying up.
3000 m
No direct sunlight No rain exposure No snow lay up
-35
+60
0-100%RH

Table of Contents

Other manuals for SolaX Power X3-ULTRA

Related product manuals