UM0027_ SOL APOLLO Series 7.4-22K_EN_V02_0523 47
6 Commissioning and operation
6.1 Mechanical checks
Carry out the main mechanical checks to ensure the EV charger is waterproof
and ready for use.
Ensure the EV charger has been correctly mounted with the supplied
mounting screws.
Ensure the AC input cable has been correctly installed.
Warning!
If the AC input cable neutral line is connected opposite to the L line, the
EV charger will become damaged due to the higher voltage.
Figure 42
Ensure the communication cable has been correctly wired and secured.
Ensure the cable gland has been correctly installed and secured.
Risk of injury due to incorrect installation!
We strongly recommend carrying out preliminary checks before
commissioning to avoid possible damage to the device caused by
faulty installation.