EasyManua.ls Logo

Sonel MPI-530-IT - Page 41

Sonel MPI-530-IT
136 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPERATING MANUAL MPI-530-IT version 1.06
39
The meter is ready for measure-
ment.
The user may read the value of
interference voltage U
N
and the
value of the leakage current flow-
ing through the clamps in the
tested object.
Measurement
Press START push-button to start the measurement.
Read out the result.
Resistance of current electrode
Resistance of voltage electrode
The value of additional uncertainty,
generated by the resistance
of auxiliary electrodes
The result is displayed on the screen for 20 s.
The result can be recalled by pressing ENTER push-
button.
S
Repeat the measurements (steps 1, 10, 11) moving the
voltage a few meters - placing it farther and closer to the
measured earth electrode. If R
E
measurement results dif-
fer from one another by more than 3 %, the distance of
the current electrode from the earth electrode being test-
ed should be considerably increased and the measure-
ments should be repeated.
Note:
Measurement of resistance-to-earth may be carried out if voltage of interfer-
ences does not exceed 24 V. Voltage of interferences is measured up to the
level of 100 V, but above 50 V it is signalled as dangerous. The meter must not
be connected to voltages exceeding 100 V.

Table of Contents

Other manuals for Sonel MPI-530-IT

Related product manuals