EasyManua.ls Logo

SPHINX Project Eight - User Manual

SPHINX Project Eight
42 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
SPHINX Project Eight Service Manual
1
A
SERVICE MANUAL
PROJECT EIGHT
REFERENCE
PRE-AMP
A
Question and Answer IconNeed help?

Do you have a question about the SPHINX Project Eight and is the answer not in the manual?

Summary

Unpacking Procedure and Warranty Information

Unpacking the Sphinx Project Eight

Step-by-step guide for unpacking the Sphinx Project Eight audio equipment and checking for transport damage.

Sphinx Warranty Card Process

Information on filling out and submitting the warranty card for service.

Manufacturer Contact Information

Details for contacting the Sphinx International Service Department for support.

Sphinx Project Eight Technical Specifications

General Checklist and Verification

Serial Number and Software Version Verification

Confirming the unit's identification details against supplied documentation.

Input Signal Functionality Checks

Testing correct naming, level settings, and polarity for all audio inputs.

Channel Imbalance Measurement Guide

Method for measuring channel imbalance across volume control steps.

Remote Control Operation Verification

Checking all remote control functions against the user manual.

Sphinx Remote Control Overview

Remote Control Buttons and LED Indicators

Explanation of the remote control's buttons and their corresponding LED status.

Remote Control Operation Details

Remote Control Command Management

Remote Control LED Status and Battery Management

Remote Control Troubleshooting

Remote Control Not Working or Learning

Troubleshooting steps for unresponsive remotes or failed command learning attempts.

Component Reaction Issues with Remote

Diagnosing problems where the component responds incorrectly or not at all.

Measurement Procedures for Project Eight

Measurement Setup and Required Equipment

Overview of the physical setup and list of specialized instruments needed for diagnostics.

Audio Signal Distortion Measurement

Procedure for measuring total harmonic distortion (THD) at the audio output.

Distortion Measurement Setup Steps

Specific configuration steps for performing audio signal distortion measurements.

Output DC-Offset Adjustment Procedure

DC-Offset Adjustment Setup

Connecting test equipment and preparing the unit for DC offset adjustment.

DC-Offset Adjustment Steps

Detailed steps for adjusting potentiometers to set the DC offset for each channel.

Diagrams and Parts List Overview

Front and Rear Panel Diagram Descriptions

Visual representation of the front and rear panel connections and controls of the Project Eight.

SPHINX Project Eight Specifications

General IconGeneral
BrandSPHINX
ModelProject Eight
CategoryAmplifier
LanguageEnglish

Related product manuals