Operators manual MODEL 80XX Planter
page 71 of 173
Maintenance
Chassis
Any adjustments or repairs to the chassis which are not
shown here may only be carried out by an authorized dealer.
Non-compliance with this rule invalidated the guarantee.
The adjustments shown here may only be carried out when the
engine is switched off!
Remove ignition key!
Secure machine against rolling away!
Never overload axles, brakes or chassis.
Loosen and tighten the wheel nuts in the sequence shown.
Note: Use a torque wrench to tighten the wheel nuts in the sequence
shown!
Standard axle wheel nuts
The screwed connection shown must be checked for tightness at the following intervals:
-Prior to the first use under load,
-After the first use under load,
-After 50 operating hours,
-After 100 operating hours,
-Thereafter, every 200 operating hours.
No. of screws: 8