EasyManua.ls Logo

SPX FLOW Universal 3 Series - Page 78

SPX FLOW Universal 3 Series
138 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance Waukesha Cherry-Burrell
®
Brand Universal 3 Pump
Page 78 95-03103 11/2018
2. Figure 183 shows the rotor nut O-ring installed.
3. Apply a small amount of anti-seize to the shaft threads, then
install the rotor nut.
4. Repeat these steps for the second rotor.
5. Insert the rotor blocking tool (part number 139790+) to keep
the rotors from turning when installing the rotor nuts.
NOTE: When working on a rotor, always block the rotor
against the body, not against the other rotor. See Figure 185.
NOTE: SPX FLOW recommends using the Non-Marring
Socket Tool for Rotor Nuts (see below) to protect the rotor
nut when torquing.
Figure 183 - O-ring installed
Figure 184 - Install rotor nut
Figure 185 - Torque rotor nut
Table 13: Rotor Nut Wrench Size and Socket Tool
U3 Model Wrench Size Socket Tool
006, 015, 018 15/16" 140074+
030, 040 1-1/4" 139795+
045, 060, 130 1-5/8" 139796+
180, 220 2-1/4" 139797+
210, 320 2-3/8" 126536+

Table of Contents

Related product manuals