EasyManua.ls Logo

ST STLINK-V3SET - Revision History

ST STLINK-V3SET
49 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Revision history UM2448
48/49 UM2448 Rev 6
Revision history
Table 20. Document revision history
Date Revision Changes
6-Sep-2018 1 Initial release.
8-Feb-2019 2
Updated:
Section 8.3.4: Virtual COM port (VCP),
Section 8.3.5: Bridge functions,
Section 9.1.2: STDC14 (STM32 JTAG/SWD and VCP),
Section 9.2.3: Virtual COM port connector explaining
how Virtual COM ports are connected to the target.
20-Nov-2019 3
Added:
Second Virtual COM port chapter in Introduction,
Figure 13 in Section 8.3.5 Bridge UART and
Figure 15 in the new section of Mechanical information.
19-Mar-2020 4
Added:
Section 12: B-STLINK-VOLT board extension
description.
5-Jun-2020 5
Added:
Section 12.5: Target voltage connection,
Section 12.6: Board connectors.
Updated:
Section 1: Features,
Section 3: Ordering information,
Section 8.2.7: UART/I
2
C/CAN bridge connector,
Section 13: STLINK-V3SET and B-STLINK-VOLT
information.
5-Feb-2021 6
Added:
Section 13: B-STLINK-ISOL board extension description
Figure 19 and Figure 20
Section 14: Performance figures
Updated:
Introduction
Ordering information
Figure 16 and Figure 17
Section 15: STLINK-V3SET, B-STLINK-VOLT, and B-
STLINK-ISOL information
All modifications linked to the latest
B-STLINK-ISOL
board for voltage adaptation and galvanic isolation

Table of Contents

Related product manuals