Index-1
IndexIndex-
A
AC power service requirements, 2-2
ActiveService Network (ASN). See ASN
APC UPS, 2-12
Network Management Card EX, 2-10
PowerChute Network Shutdown, 2-10
qualified models, 2-9
qualified Symmetra models, 2-9
AS/NZS 3112-1993 connector, B-10
A-side power source, 2-1
ASN, site planning, 1-3, 3-3, 4-8
B
BS connector
1363/A, B-10
B-side power source, 2-1
C
cabinets
configuration planning, 5-1, 5-5
requirements, 6-1
specifications, A-4
cables
Ethernet network, 4-5
Fibre Channel, 4-2, 4-3
planning for, 3-3, 4-1
telephone, 3-3
CAC, getting assistance, 1-2
CEE connector
(7) VII, B-9
checklist for site planning, 1-2
circuit, electrical
planning information, B-1
wiring diagrams, B-2
communications cables
planning for, 4-1
compliance, standards, C-1
connectors, electrical, B-9
BS 1363/A, B-10
CEE (7) VII, B-9
GB1002-1996, B-10
IEC 60309, B-9
NEMA 5-15, B-9
NEMA L6-20, B-9
SAA/3/15 AS/NZS 3112-1993, B-10
SABS 164-1:1992, B-9
SEV 1011-S24507, B-10
CPP
UPS, 2-12
current requirements, from PDU, 5-2
Customer Assistance Center. See CAC
D
dust contamination, 3-1
E
earth reference ground, B-1
electrical
connectors, B-9
grounding, B-1
power planning, 2-1
wiring, B-1
EMC storage systems, 1-5, 4-2
environmental requirements
maximum rate of temperature change, A-5
operating humidity, A-5
storage humidity, A-5
Ethernet
network cables, 4-5
F
fault-tolerant systems, site planning, 1-3
Fibre Channel
cables, 4-3
connections, 4-2
switches electrical requirements, 2-3
Fibre Channel switches, 1-5
ftGateway, site planning information, 4-9