EasyManua.ls Logo

Structural Concepts Oasis BV3632 - Case Removal from Shipping Skid; Detaching Shipping Brackets from Skid; Safely Moving Case Off Skid Using Casters

Structural Concepts Oasis BV3632
31 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5
INSTALLATION: CASE REMOVAL (VIA LEVELERS & CASTERS)
Ramp
Skid
Support case
while rolling
down ramp.
2. Remove Case From Skid (Casters)
Remove shipping brackets that secure casters to skid
Important! Case is shipped with levelers in the
DOWN position (for stability). To prevent damage to
the case, all levelers must be raised ALL THE WAY
UP before moving unit off skid and into position.
After levelers are raised all the way up, place ramp
up against skid (to allow case to smoothly roll off
from skid).
Maintain support of case at all times or center of
gravity may cause case to fall.
Roll unit to rear of skid. Roll down ramp and off skid.
Various Types Of
Case Shipping
Brackets
1. Removing Case Shipping Brackets That Are Attached To Skid
Remove screws holding Case Shipping Brackets to skid.
Remove Case Shipping Brackets from Skid.
See illustrations below. Note: Shipping Brackets will vary in size, shape, material and location
depending upon case type and model.

Related product manuals