10 | Sub-Zero Customer Care 800.222.7820
Placement
CAUTION
Before moving the unit into position, secure doors
and drawers closed, and protect any finished flooring.
Use an appliance dolly to move the unit near the opening.
If the unit has been on its back or side, it must stand
upright for a minimum of 24 hours before connecting
power.
Plug the power cord into the grounded outlet, and roll the
unit into position. Verify the anti-tip bracket is properly
engaged.
WARNING
When positioning the appliance, ensure the supply
cord is not trapped or damaged.
Installation
Anti-Tip Bracket
CONCRETE WEDGE ANCHOR INSTALLATION
1 Drill a ⁄" (10) diameter hole any depth exceeding the
minimum embedment. Clean the hole or drill additional
depth to accommodate the drill fines.
2 Assemble the washer and nut flush with the end of
anchor to protect threads. Drive the anchor through
the material to be fastened until the washer is flush with
the surface material.
3 Expand the anchor by tightening the nut 3–5 turns past
hand-tight position or to 25 foot-pounds of torque.
WARNING
Verify there are no electrical wires or plumbing in the
area which the screws could penetrate.
CAUTION
Always wear safety glasses and use other neces-
sary protective devices or apparel when installing or
working with anchors.
Anchors are not recommended for use in lightweight
masonry material such as block or brick, or for use
in new concrete which has not had sucient time to
cure. The use of core drills is not recommended to
drill holes for the anchors.