EasyManua.ls Logo

Sullair LS20 - Page 4

Sullair LS20
156 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TABLE OF CONTENTS
Section 4
INSTALLATION
(CONT).
19 4.4 COUPLING ALIGNMENT CHECK
19 4.5 FLUID LEVEL CHECK
20 4.6 ELECTRICAL PREPARATION- ELECTRO-
MECHANICAL
20 4.7 ELECTRICAL PREPARATION- SUPERVISOR
20 4.8 MOTOR ROTATION DIRECTION CHECK- STANDARD
ELECTRO-MECHANICAL
21 4.9 MOTOR ROTATION DIRECTION CHECK- SUPERVISOR
Section 5
SUPERVISOR
CONTROLLER
23 5.1 SUPERVISOR KEYBOARD
23 5.2 MAIN DISPLAY
23 5.3 FUNCTION MENU
24 5.4 STATUS- CURRENT PRESSURES, TEMPERATURES,
INPUTS AND OUTPUTS
24 5.5 CONTROL PARAMETERS- PRESSURE, TEMPERATURE
AND TIMER SETTINGS
25 5.6 MAINTENANCE- PREVENTIVE MAINTENANCE
INFORMATION AND TIMERS
25 5.7 SEQUENCING- SEQUENCING & COMMUNICATION
PARAMETERS
26 5.8 SYSTEM DISPLAY- DISPLAY OF MODES OF MACHINES
IN A SEQUENCING SYSTEM
26 5.9 CALIBRATION- CORRECTION FACTORS FOR
PRESSURES
26 5.10 FACTORY SETUP- Model settings.
27 5.11 TEST
Section 6
OPERATION 29 6.1 MOTOR ROTATION DIRECTION CHECK
29 6.2 INITIAL START-UP PROCEDURE
29 6.3 SUBSEQUENT START-UP PROCEDURE
29 6.4 SHUTDOWN PROCEDURE
Section 7
TROUBLESHOOTING-
SUPERVISOR
31 7.1 TROUBLESHOOTING INTRODUCTION
31 7.2 TROUBLESHOOTING GUIDE- SUPERVISOR CONTROLLER
36 7.3 MACHINE BEHAVIOR AFTER A POWER OUTAGE
36 7.4 REMOTE STOP/START INPUT
36 7.5 BROWN OUT INPUT

Table of Contents

Related product manuals