TABLE OF CONTENTS
Section 4
INSTALLATION
(CONT).
19 4.4 COUPLING ALIGNMENT CHECK
19 4.5 FLUID LEVEL CHECK
20 4.6 ELECTRICAL PREPARATION- ELECTRO-
MECHANICAL
20 4.7 ELECTRICAL PREPARATION- SUPERVISOR
20 4.8 MOTOR ROTATION DIRECTION CHECK- STANDARD
ELECTRO-MECHANICAL
21 4.9 MOTOR ROTATION DIRECTION CHECK- SUPERVISOR
Section 5
SUPERVISOR
CONTROLLER
23 5.1 SUPERVISOR KEYBOARD
23 5.2 MAIN DISPLAY
23 5.3 FUNCTION MENU
24 5.4 STATUS- CURRENT PRESSURES, TEMPERATURES,
INPUTS AND OUTPUTS
24 5.5 CONTROL PARAMETERS- PRESSURE, TEMPERATURE
AND TIMER SETTINGS
25 5.6 MAINTENANCE- PREVENTIVE MAINTENANCE
INFORMATION AND TIMERS
25 5.7 SEQUENCING- SEQUENCING & COMMUNICATION
PARAMETERS
26 5.8 SYSTEM DISPLAY- DISPLAY OF MODES OF MACHINES
IN A SEQUENCING SYSTEM
26 5.9 CALIBRATION- CORRECTION FACTORS FOR
PRESSURES
26 5.10 FACTORY SETUP- Model settings.
27 5.11 TEST
Section 6
OPERATION 29 6.1 MOTOR ROTATION DIRECTION CHECK
29 6.2 INITIAL START-UP PROCEDURE
29 6.3 SUBSEQUENT START-UP PROCEDURE
29 6.4 SHUTDOWN PROCEDURE
Section 7
TROUBLESHOOTING-
SUPERVISOR
31 7.1 TROUBLESHOOTING INTRODUCTION
31 7.2 TROUBLESHOOTING GUIDE- SUPERVISOR CONTROLLER
36 7.3 MACHINE BEHAVIOR AFTER A POWER OUTAGE
36 7.4 REMOTE STOP/START INPUT
36 7.5 BROWN OUT INPUT