EasyManua.ls Logo

Sunways NT 10000 - Commissioning main unit

Sunways NT 10000
88 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Commissioning
NT 10000...NT 12000 33
Commissioning main unit
1. The commissioning process starts with setting of the display language. Se-
lect the language in selection menu with / .
Confirm the selected language with .
2. Select the country in the selection menu with / .
NT series (900 V) PT series AT series NT series (850 V)
NT series
(850 V)
with RS485:
Sunways Portal:
with Sunways
Communicator
NT with RS485 / PT
with CAN bus:
Sunways Portal:
connect NTs with
Sunways Commu-
nicator, PTs with
Sunways Modem
or DSL/network
to the Internet
Sunways Browser:
only available for
PT
with RS485:
Sunways Portal:
with Sunways
Communicator
Sunways Monitor
with RS485:
Sunways Portal:
with Sunways
Communicator
Sunways Monitor:
with interface
converter
AT series with separate
CAN networks:
Sunways Browser
Sunways Portal:
NT devices (900 V)
must be operated
in a separate CAN
network with in-
dependent main
unit
with CAN bus:
Sunways Browser
Sunways Portal
The PT Solar In-
verter must be
the main unit.
with CAN bus:
Sunways Browser
Sunways Portal
PT series with separate
CAN networks:
Sunways Browser
Sunways Portal:
NT devices (900 V)
must be operated
in a separate CAN
network with in-
dependent main
unit
with CAN bus:
Sunways Browser
Sunways Portal
NT series
(900 V)
with CAN bus
(CANopen/CiA437):
Sunways Browser
Sunways Portal

Related product manuals