EasyManua.ls Logo

Supermicro SC847 JBOD - Chapter 5 Rack Installation; Rack Installation Preparation

Supermicro SC847 JBOD
116 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5-1
Chapter 5: Rack Intallation
Chapter 5
Rack Installation
This chapter provides instructions for preparing and mounting your chassis in a rack.
5-1 Unpacking the System
You should inspect the box the chassis was shipped in and note if it was damaged

who delivered it.
5-2 Preparing for Setup
Decide on a suitable location for the rack unit that will hold your chassis. It should
be a clean, dust-free area that is well ventilated. Avoid areas where heat, electrical

is required
The box your chassis was shipped in should include two sets of rail assemblies, two
rail mounting brackets and the mounting screws to mount the system into the rack.
Please read this chapter in its entirety before beginning the installation procedure.
Choosing a Setup Location
Leave at least 25 inches clearance in front of the rack to open the front door
completely.
Leave approximately 30 inches of clearance in the back of the rack to allow for
󰀩
It should be a restricted access location, such as a dedicated equipment room
or a service closet.

Table of Contents

Related product manuals