SC847 JBOD Chassis Manual
5-4
5-4 Installing the Rails
There are a variety of rack units on the market, and some may require a slightly
󰀨          
the system into a rack with the provided rack rails. Also refer to the installation


type rack.
Identifying the Rails
The chassis package includes two rail assemblies. Each assembly consists of three
sections: An inner rail that secures directly to the chassis, an outer rail that secures
to the rack, and a middle rail which extends from the outer rail. These assemblies

Figure 5-1. Identifying the Outer Rail, Middle Rail and Inner Rail
(Left Rail Assembly Shown)
Inner Rail
Rail Assembly
(Shown with Rails
Retracted)
This Side Faces
Outward
Locking Tab
Middle Rail
Outer Rail
Note: Both front chassis rails and the rack rails have a locking tab, which serves
two functions. First, it locks the server into place when installed and pushed fully
into the rack (its normal operating position. In addition, these tabs lock the server
in place when fully extended from the rack. This prevents the server from coming
completely out of the rack when pulled out for servicing.