EasyManua.ls Logo

Suzuki DF100 - ENGINE BREAK-IN PROCEDURE

Suzuki DF100
125 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
28
Check for proper operation of the Power
Trim and Tilt.
Make sure the tilt pin is securely installed
in the proper position.
Check for proper trim angle.
Make sure you have the boating safety
and emergency equipment on board.
BREAK-IN
Proper operation during this break-in period will
help ensure maximum life and performance
from your engine. The following guidelines will
explain proper break-in procedures.
Break-in period: 10 hours
Break-in procedure
1. For the initial 2 hours:
Allow sufficient idling time (about 5 minutes)
for the engine to warm up after cold engine
starting.
After warming up, run the engine at idling speed
or the lowest in-gear speed for about 15 min-
utes.
During the remaining 1 hour and 45 minutes, if
safe boating conditions permit, operate the
engine in gear at less than 1/2 (half) throttle
(3000 r/min.).
NOTE:
You may throttle up beyond the recommended
operating range to plane your boat, then imme-
diately reduce the throttle to the recommended
operating range.
NOTICE
Failure to follow the break-in procedures
described below can result in severe
engine damage.
Be sure to follow the engine break-in pro-
cedures described below.
NOTICE
Running at high speed without sufficient
warm-up may cause severe engine dam-
age such as piston seizure.
Always allow sufficient idling time (5 min-
utes) for the engine to warm-up before
running at high speed.

Table of Contents

Related product manuals