EasyManua.ls Logo

Taylor 60 - sec6-b

Taylor 60
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
20
Models 60 & 62Operating Procedures
Step 3
Place the control switch in the “AUTO” position.
Figure 35
Step 4
To initiate freeze down, rotate the draw valve to the
right so it is disengaged from the draw arm. Lift the
draw arm momentarily. This will start the freezing
cycle. Lower the draw arm and re- engage the draw
valve. When the unit cycles off, the product is ready to
serve.
Figure 36
Step 5
Fill the mix hopper with mix. As the mix level comes in
contact with the mix sensing probe on the rear wall of
the hopper, the “MIX LOW” light will stop flashing.
Figure 37
Place the mix hopper cover in position.
Figure 38

Other manuals for Taylor 60

Related product manuals