REFRIGERANT PIPE INSTALLATION
The system is not provided with pipework or interconnecting wires, which should be supplied by
the engineer and cut to the appropriate size. The unit is precharged for 5 metres of pipework and
refrigerant must be added if the pipe length is more than 5 metres. This operation can only be
performed by a professional F-Gas engineer, for the additional gas amount, see the below:
FLARING THE PIPES
1. Cut the refrigerant pipe to the correct length using a pipe cutter.
2. Ensure the end of the pipe is smooth.
3. Slide the connecting nut onto the pipe before flaring with an appropriate tool, to create a
flare with the requirements below.
Diameter
Additional Refrigerant
Max pipe length
Max difference
in Height
Liquid Side
Φ6.35 (1/4)
(Total length of pipe run
5 meters) x 15 g
15m
10m
Gas Side
Φ9.52 (3/8”)

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the TCL iQool-C2MS12K12K and is the answer not in the manual?

TCL iQool-C2MS12K12K Specifications

General IconGeneral
BrandTCL
ModeliQool-C2MS12K12K
CategoryAir Conditioner
LanguageEnglish

Related product manuals