Explains the positive displacement type of rotary meters and their double case construction for ease of maintenance.
General guidelines for inspection, cleaning, and part care during disassembly.
Lists essential tools and equipment required for meter disassembly.
Procedure for removing the outer cover on C2 through JA10-S1 and A1 models.
Maintenance schedule and lubricant for the high-pressure packing gland.
Step-by-step service and disassembly of the high-pressure packing gland.
Steps to remove the gear train assembly from the meter cover.
How to check and adjust rotor end clearance of the inner mechanism.
Procedure for adjusting rotor end clearance in C2 to G6 models.
Procedure for adjusting rotor end clearance in H8 and JA10 models.
Detailed steps for removing and disassembling the meter's inner mechanism.
Process for removing and inspecting rotor cover rollers and pins.
Notes the rotor spring placement and adjustment method for C2 series meters.
Reference table for recommended minimum and maximum fitting clearances for meter repair.
How to perform clearance checks using feeler gauges and assess part condition.
Method for measuring blade slot clearance using feeler gauges.
Procedure to measure blade top end clearance below the rotor.
How to check clearance between blade tips and the meter housing.
Method for measuring clearance between the rotor and the block.
Procedure to measure clearance between blade rollers and the cam radius.
Steps for adjusting the rotor's total end clearance.
Template for documenting "as found" and "as assembled" meter clearances.