EasyManua.ls Logo

TechnipFMC Smith Meter K12 S6 User Manual

Default Icon
30 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Smith Meter
®
Rotary Vane PD Meters
Bulletin MN01006 Issue/Rev 0.4 (12/18)
Service Manual
Smith Meter
®

PD Meters
MANUAL
Models



Question and Answer IconNeed help?

Do you have a question about the TechnipFMC Smith Meter K12 S6 and is the answer not in the manual?

TechnipFMC Smith Meter K12 S6 Specifications

General IconGeneral
BrandTechnipFMC
ModelSmith Meter K12 S6
CategoryMeasuring Instruments
LanguageEnglish

Summary

Overview and Introduction

Service Manual Scope and Purpose

Details the manual's coverage for Smith Meter Double Case, 3-bladed Rotary Meters, including inspection and service.

Smith Meter PD Meter Disassembly

General Meter Disassembly Guidelines

Essential procedures for meter inspection and maintenance, emphasizing part cleaning and following step-by-step instructions.

High Pressure Packing Gland Maintenance

Servicing the packing gland with glycerine solution at intervals not exceeding 60 days for optimal sealing and lubrication.

Tools and Fixtures for Meter Servicing

Listing of necessary tools and equipment, such as lifting devices and feeler gauges, to facilitate meter maintenance.

Removing the Inner Unit from Housing

Step-by-step guide for detaching the inner unit from the outer housing, covering packing gland and vent kit procedures.

Removing the Inner Unit Cover

Instructions for removing the inner unit cover, including vent tube checks, calibrator drive gear, and thrust bearing assembly.

Rotor Assembly Removal Procedure

Guidance on extracting the rotor assembly, involving adjusting screw lock nut, rotor positioning, and blade tip clearances.

Detailed Rotor Disassembly Steps

Process for disassembling the rotor, covering cover rollers, clamps, and the rotor cover removal.

Cam Shaft Disassembly and Adjustment

Procedure for taking apart the cam shaft, including removing the lock roll pin, adjusting screw, and block.

Blade Roller Assembly Disassembly

Instructions for disassembling blade roller assemblies, focusing on socket head screws, end plugs, and threaded sleeves.

Rotor Gear Plate Assembly Removal

Steps to detach and disassemble the rotor gear plate assembly, addressing clips and bearing components.

Rotor Bearing Removal from Cover

Procedure for removing rotor bearings from the cover assembly, detailing sealing wire, lock plate, and shim removal.

Smith Meter PD Meter Reassembly and Checks

Standard Reassembly Procedures

Reversing disassembly steps, checking clearances, dressing blade edges, and fitting new blades to the meter case.

Clearance Guide for Meter Repair

Reference for recommended minimum and maximum fitting clearances for various meter models and sizes during repair.

Meter Clearance Record Template

A form for documenting 'as found' and 'as assembled' clearances during meter servicing and maintenance.

Related Technical Publications

Available TechnipFMC Literature

List of obtainable literature, including specifications, parts lists, and installation/operation/maintenance manuals.

Related product manuals