EasyManua.ls Logo

TechnipFMC Smith Meter G6 User Manual

Default Icon
30 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
MANUAL
G6-S1 - Straight Through Type
F4-A1 - Angle Type
Smith Meter
®
Rotary Vane PD Meters
Service Manual

Models
Straight Through Angle Type

 
 
 
 




Question and Answer IconNeed help?

Do you have a question about the TechnipFMC Smith Meter G6 and is the answer not in the manual?

TechnipFMC Smith Meter G6 Specifications

General IconGeneral
BrandTechnipFMC
ModelSmith Meter G6
CategoryMeasuring Instruments
LanguageEnglish

Summary

Overview and Introduction

Description of Smith Meter PD Meters

Overview of the double case rotary meter construction and measuring function.

Disassembly Procedures

General Disassembly Procedures

General advice and precautions for disassembling the meter.

Recommended Tools for Disassembly

Lists necessary tools and equipment for meter disassembly.

Outer Cover Disassembly

Steps for removing the outer cover and associated parts.

Packing Gland Maintenance

Guidance on maintaining the high-pressure packing gland.

Packing Gland Service Procedures

Detailed steps for servicing the high-pressure packing gland.

Gear Train Removal

Procedure for removing the gear train from the meter cover.

Inner Mechanism Overview

Information on the inner mechanism and rotor adjustment.

Meter Adjustment for C2-G6 Models

Steps for adjusting rotor end clearance on specific meter models.

Meter Adjustment for H8 & JA10 Models

Adjustment procedure for H8 and JA10 meter rotor end clearance.

Inner Mechanism Disassembly

Steps for removing and disassembling the inner mechanism.

Rotor Cover Rollers Removal

Procedure for removing rotor cover rollers and associated parts.

C2 Series Meter Specifics

Notes differences in rotor spring for the C2 series meter.

Clearance Checks and Guide

Clearance Guide for Meter Repair

Lists recommended minimum and maximum fitting clearances for meters.

Performing Clearance Checks

Guidance on checking clearances using feeler gauges.

Blade Slot Clearance Measurement

How to measure blade slot clearance using feeler gauges.

Blade Top End Clearance Measurement

Method for measuring blade top end clearance with a micrometer.

Blade Tip to Housing Clearance

How to measure blade tip to housing clearance using a spider.

Rotor to Block Clearance Measurement

Procedure for measuring rotor to block clearance using a spider.

Blade Roller to Cam Radius Clearance

How to measure blade roller to cam radius clearance.

Alternate Clearance Measurement Method

Alternative method for measuring blade roller to cam radius difference.

Rotor Adjustment and Total End Clearance

Procedure for adjusting rotor and checking total end clearance.

Meter Clearance Record Keeping

Template for recording meter clearance measurements.

Reassembly Procedures

Total End Clearance Adjustment

Procedure for setting total end clearances by adjusting the rotor.

Rotor to Block and Blade Slot Clearances

Determining and recording rotor to block and blade slot clearances.

Inner Unit Assembly into Outer Housing

Steps for correctly assembling the inner unit into the outer housing.

Inner Mechanism Sealing with Loctite 518

Applying Loctite 518 for sealing the inner mechanism to the housing.

Cinch Bolt Sealant Application

Detailed steps for applying sealant to cinch bolts during assembly.

Complete Reassembly Steps

Final steps for completing the meter reassembly process.

Cover Screw Installation and Torquing

Instructions for installing and torquing cover screws.

Packing Gland Installation and Torquing

Steps for installing and torquing packing gland screws.

Related Publications and Literature

Related product manuals