11. List of spare parts 35
12. Technical data 36
13. EC declaration of conformity 37
14. ATEX Annex to the EC declaration of conformity 38
14.1. ATEX devices 38
14.2. ATEX components 38
15. Training protocol 40
16. Maintenance intervals 41
16.1. Usage-related maintenance 41
16.2. General maintenance 42
16.2.1. Visual inspection of the device 42
16.2.2. Visual inspection of the pipelines for dust deposits 43
16.2.3. Visual inspection of the pneumatic pipes 43
16.2.4. Functional test of the device 43
16.2.5. Electrical test of the electrical lines and earthing connections 44
16.2.6. Test of fixing of the mounted unit elements 44
17. Annex A: ATEX conductivity measurement protocol 45
BA_LFE-101-201-301_ST1_20230808_EN