Installation Model 3290
Teledyne Analytical Instruments 22
3.5 Installation Checklist
Before connecting the instrument to the power source and turning it
on, make sure you have:
Correctly installed the Sample and Exhaust gas lines
Opened the isolation valves
Checked for leaks
Set the sample pressure to achieve a 2 SCFH flowrate.
Once the above checks have been made, you can connect to the
power source. The instrument is now ready for operation.