EasyManua.ls Logo

Telrad CPE9000 - Connecting the Cables

Telrad CPE9000
119 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LTE Outdoor CPE | User Manual P. 17
Mounting the ODU: Mount LTE Outdoor CPE on a 1”-4” pole using the supplied kit, or
the optional tilt accessory.
Using the clamp
1.
Thread the M10*100mm bolt through a spring washer, flat washer and the bracket holes.
2.
With the connector facing downward, attaché LTE Outdoor CPE to a 1”-4” pole.
3.
Attach the bracket to the other side of the pole.
4.
Thread the M10*100mm bolts through both holes on either side, and tighten the nuts.
Connecting the Cables