EasyManuals Logo

Terberg OmniDEL User Manual

Default Icon
37 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #9 background imageLoading...
Page #9 background image
9
3. Transport and storage
3.1 General
- Check the position of the centre of gravity of the bin lift when raising this with a forklift truck or tackle.
- When dismantling disconnect the bin lift from the vehicle using the plugs and quick release couplings intended
for this purpose.
- Protect the 16-pole connecting plugs from water.
- Connect the hydraulic couplings together.
- Weight: OmniDEL: 595 kg (depending on configuration)
OmniDEL e: 655 kg (depending on configuration)
- Use a mobile hoist with minimum lifting capacity of 1000 kg and a hoist beam.
- Raise the bin lift using the lifting points provided.
- Lay the bin lift flat on the ground.
ã Terberg Machines B.V. IJsselstein, The Netherlands
All rights reserved. No part of this book may be reproduced, stored in database or retrieval system, or published, in any form or in any way,
electronically, mechanically, by print, photoprint, microfilm or any other means without prior written permission from the publisher.
Min. 1000 kg
1
9
6
1
3
6
3

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Terberg OmniDEL and is the answer not in the manual?

Terberg OmniDEL Specifications

General IconGeneral
BrandTerberg
ModelOmniDEL
CategoryLifting Systems
LanguageEnglish

Related product manuals