THERMAL INNOVATIONS (UK) LTD | THERMAFLOW® ELECTRIC COMBINATION BOILER | Tel: 0870 850 5207
23
NOTE: The system fill pressure may require to be recharged once or twice in the first two to
three weeks after the initial commissioning of the boiler due to oxygen in the system being
expelled through the automatic air eliminator. There should be no further need to re-pressurise
the system after this period. If the system requires continuous re-pressurisation, there may be a
leak in the installation.
2.7.6 Completion
Set any external heating control to the desired settings.
Instruct the user
Instruct and demonstrate the isolating switches then advise the user of the efficient and safe operation
of the boiler.
Instruct and demonstrate the operation of any heating system controls.
Advise the user on the use and maintenance of any scale reducer and pass on any relevant
instructional documents.
Advise the user that to ensure continued efficient and safe operation of the appliance, it is
recommended that it is checked and serviced at regular intervals. The frequency of servicing will
depend on the particular installation and usage, but in general once a year should be enough.
Any servicing should be carried out by a person competent to do so.
Advise the user of the precautions necessary to prevent damage to the system and building in the
event of the heating system being out of use during frost and freezing conditions.
Reminder- leave these instructions with the user.
Advise the user that the logbook should be completed by the engineer on completion of commissioning.
Failure to do so will invalidate the warranty. The user must sign the log book and retain it for future
reference.