4 Configuration of control system
4.1 Commissioning
Caution The installation may only be commissioned if the hydraulic system has
been filled and bled. Otherwise circulation pump can be damaged. If
the installation is only to be driven by the auxiliary heater during the
installation, ensure that the heating system is filled and compressor
cannot be started.
4.2 Important information when starting up for the first time.
1. When the display is started up for the first time, the language selection first appears.
2. After language selection, machine profile and size of the outdoor unit must be selected.
3. After selecting the size, the factory setting is set and "WAIT.." is displayed in the meantime.
4.3
Select display language
The following settings are made in the Information Menu. To enter the Information Menu, press . Use or buttons to move up
and down in the menu.
Select display language in the INFORMATION menu:
▪
INFORMATION
▪
Press
several times to get to the LANGUAGE entry.
▪
Press to enter the LANGUAGE menu.
▪
Use
or to navigate to the desired language.
▪
Press to chose language. An asterisk (*) will appear next to chosen language.
▪
Press twice to exit the Information Menu.
4.4
Setting heat pump size
Caution The installation may only be commissioned if the heating system and
water heater have been filled and bled. Otherwise the circulation
pump can be damaged.
If there is no outdoor unit installed at this time, please return to this
step when it is or select NO OUTDOOR UNIT.
Commissioning iTec XT
Thermia AB AWIXT01CG0102
11