EasyManuals Logo

Thermo King SLXi Spectrum User Manual

Thermo King SLXi Spectrum
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #43 background imageLoading...
Page #43 background image
Loading and Enroute Inspections
40
Loading and Enroute Inspections
This chapter describes pre-loading, post loading, and enroute
inspection procedures. Thermo King refrigeration units are
designed to maintain the required product load temperature
during transit. Follow these recommended loading and enroute
procedures to help minimize temperature related problems.
Pre-Loading Inspection
1. Pre-cool products before loading. Note any variances on
the manifest.
2. Inspect door seals and vent doors for condition and a tight
seal with no air leakage.
3. Inspect the trailer inside and out. Look for:
Damaged or loose trailer skin and insulation
Damaged walls, air ducts, floor channels or “T”
flooring
Clogged defrost drain tubes
Blocked return air bulkhead
4. Verify that the setpoint temperature is correct for your
cargo. Pre-cool the trailer as required.
5. Supervise product loading to ensure sufficient air space
around and through the load. Airflow around the cargo
must not be restricted.
NOTE: If the warehouse is not refrigerated, operate the
unit with doors closed until cargo is ready to be loaded.
Then turn off the unit, open cargo doors and load cargo.
When cargo is loaded, close trailer doors and restart the
unit.
The unit can be operated with the cargo box doors open
if the truck is backed into a refrigerated warehouse and
the dock door seals fit tightly around the trailer.

Other manuals for Thermo King SLXi Spectrum

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Thermo King SLXi Spectrum and is the answer not in the manual?

Thermo King SLXi Spectrum Specifications

General IconGeneral
BrandThermo King
ModelSLXi Spectrum
CategoryRefrigerator
LanguageEnglish

Related product manuals