3.1 Extent of delivery
The extent of delivery for the power unit NOMARK 65/99 contains the following
components and accessories:
• 1 power unit NOMARK 65/99
• 1 welding gun C0 or C1
• 1 earth cable with two earth clamps.
• Accessories set including :
1 socket spanner (width across flats 17 mm)
1 welding gun Chuck M3
1 welding gun Chuck M4
1 welding gun Chuck M5
1 welding gun Chuck M6
1 welding gun Chuck M8
• 1 set of operating instructions for NOMARK 65/99 with C0/C1 gun
Note:
The article numbers for orders are to be found from chapter 5.4 on.
The accessories are only free of charge when ordering a complete set.
3.2 Receiving inspection
The power unit was checked for working order before dispatch.
It must be checked on delivery for damage and completeness of
the parts contained in the extent of delivery.
The manufacturer or responsible haulage company must be notified
immediately of any transport damage and/or missing parts.
3.3 Storage
If the power unit NOMARK 65/99 is not put into operation directly after
delivery, it must be stored in a secure place.
The complete power unit must be protected adequately against
dust and moisture.
To preserve the lifetime of the capacitors, the power unit must be
switched on for about an hour every six weeks, with the charging
voltage being raised gradually from 1 to 10. Then turn the charging
voltage regulator back to position 1.
3.4 Transport
To avoid damaging the power unit, the NOMARK 65/99 should only be
32
transported using the carrying handle provided.