EasyManua.ls Logo

Topcon RL-VH3A - Preparation For Use; Battery Installation; Instrument Set-up Procedure

Topcon RL-VH3A
75 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18
Preparation For Use
Battery Installation
For battery placement or replacement instructions, see Maintaining Power Sources section,
page 45 .
Instrument Set-up Procedure
Horizontal Rotation
1 Set the instrument on any smooth surface that is
within ±5° of true level. The RL-VH3G/A/B auto-
level system will not function if the unit is placed
more that 5° out of level. For best operation, it is
recommended that it be mounted to a tripod or
the Topcon Wall Mount Model 2C (provided).
Slope can be set in both axes, X and Y. See
"Setting Slope" section, page 28 .
Leveling range
Horizontal

Other manuals for Topcon RL-VH3A

Related product manuals