Notation for Areas of Concern
Inspection performed by:
Item Date Information
1
2
3
4
5
Pre-Maintenance Procedures
Preparing for Maintenance
1. Park the machine on a level surface, disengage the PTO, lower the cutting units, and
engage the parking brake.
2. Shut off the engine, remove the key, wait for all moving parts to stop, and allow the
engine to cool.
Opening the Hood
G437866
Release the 2 hood latches and rotate open the
hood.
3464-482A Page 6–5 Maintenance: Pre-Maintenance Procedures