Engine/PowerheadInstallation(continued)
g352011
Figure10
5.Installthebeltontothedriveblade.
6.Installthebladeontotheenginecrank.RefertotheproductOperator’s
Manualforthebladeinstallationprocedures.
7.Installthebrakecable.BrakeCableInstallation(page5–6)
8.Modelsequippedwithelectricstartonly,connectthebatterybyinstalling
thepositivecablerst,thenthenegativecabletothebattery.Installthefoam
padandbatterycover.Securethebatterycoverwith2(M4.2x2.0)screws.
Torquethescrewsto2.26±0.34N•m(20±3in-lbs).
9.Modelsequippedwiththe60vpowerhead,installtheharnesstothe
powerhead.
PowerSource:ServiceandRepairs
Page4–8
22InchAWD/RWDSteelDeckWalkPower
MowerServiceManual
3445-579RevA