Setup
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure Description
Qty .
Use
1
No parts required
–
Prepare the machine.
2
No parts required
–
Remove the guards (machines equipped
with MyRide only).
Bolt (3/8 x 1 inch)
4
Locknut (3/8 inch)
6
Left weight-mounting bracket
1
Right weight-mounting bracket 1
W asher 2
Bolt (5/8 x 2-3/4 inches)
2
3
Suitcase weight
8
Install the weights.
4
No parts required
–
Install the guards (machines equipped
with MyRide only).
Stabilizer bracket
1
Carriage bolt (5/16 x 3/4 inch)
2
Locknut (5/16 inch)
4
Self-tapping screw (5/16 x 3/4 inch)
2
Bolt (5/16 x 1 inch)
2
Pivot frame
1
Hairpin cotter 2
Rod 2
5
W asher 2
Install the attachment mount.
Latch rod 1
6
Hairpin cotter 1
Install the latch rod.
Bagger top 1
7
Bagger screen 1
Assemble the bagger top.
Upper bagger tube 1
Bag frame
2
Bag assembly 2
8
Rivet 8
Install the bagger top.
Baf e (50in decks only)
1
Bagging cutof f baf e (60in decks only)
1
Front baf e (60in decks only)
Carriage bolt
2
Push-nut 1
9
Locknut 1
Install the baf es.
Chute
1
10
Hand knob (model 79413 only)
1
Install the chute
1 1
No parts required
–
Connect with the discharge tube.
5