5
AdjustingtheSwayLinks
NoPartsRequired
Procedure
TheProCore864isdesignedtobeoffsetfromthe
tractionunitcenterline.Thegearboxinputshaft
isoffset40mm(1.57inches)totheleftofcenter
andthemachineisoffset145mm(5.70inches)to
therightofthecenterline.Adjusttheswaylinks
asneeded.
TheProCore1298isdesignedtobecenteredwith
thetractionunitcenterline.Adjusttheswaylinks
asneeded.
Adjusttheswaylinksonthelowerdraftarmsofthe3
pointhitchtoresistside-to-sideswaytoamaximum
of25mm(1inch)ateachside(Figure14).
g007333
Figure14
1.Swaylink(lowerdraftarm)
Adjustthelowerlinksinboarduntiltheycontactthe
machinemountingplates.Thisreducesstresson
thepins.Ifthetractionunithasswaychainsinstead
ofswaylinks,installwashersbetweenthelowerlink
armandlynchpintoreducetheoverhungloadonthe
liftpins.
Note:Refertothetractionunitoperator'smanualfor
additionalinstallationandadjustmentprocedures.
6
LevelingtheMachine
Side-to-Side
NoPartsRequired
Procedure
1.Parkthetractionunitandthemachineona
level,rmsurface.
2.Placealevelontopoftheframeofthemachine
tocheckitforlevelside-to-side(Figure15).
g007329
Figure15
1.Level
3.Ifprovided,turntheadjustablelinkbodytoraise
orlowerthelinkarmuntilthemachineisleveled
side-to-side.
Note:Refertothetractionunitoperator's
manualforadditionaladjustmentprocedures.
7
AdjustingtheRoller
Scraper
NoPartsRequired
Procedure
Adjusttherollerscrapersothatthereisagapof
approximatelya1to2mm(0.06to0.09inch)between
thescraperandtheroller.
1.Loosenthefastenerssecuringeachendof
scrapertorollerscrapertab(Figure16).
13