EasyManua.ls Logo

Toro ProCore 864 - Jacking the Machine; Greasing the Bearings and Bushings

Toro ProCore 864
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
JackingtheMachine
CAUTION
Ifthemachineisnotproperlysupportedby
blocksorjackstands,themachinemaymove
orfall,whichmayresultinpersonalinjury.
Ensurethatthemachineisparkedona
solid,levelsurfacesuchasaconcrete
oor.Alwayschockthetractionunittires.
Priortoraisingthemachine,removeany
attachmentsthatmayinterferewiththe
safeandproperraisingofthemachine.
Whenchangingattachmentsorperforming
otherservice,usecorrectblocks,hoists
orjacks.
Usejackstandsorsolidwoodblocksto
supporttheraisedmachine.
Note:Ifavailable,useahoisttolifttherearofthe
machine.Usetheeyeletsinthecoringheadbearing
housingsashoistattachmentpoints(Figure26)
g007308
Figure26
1.Liftingeyelets
GreasingtheBearingsand
Bushings
ServiceInterval:Every50hours
Themainworkingbearingsofthemachinearesealed
forlifeandrequirenomaintenanceorlubrication.
Thisdrasticallyreducesthemaintenancerequired
andeliminatestheriskofgreaseoroilbeingdropped
ontotheturf.
Therearegreasettingsthatmustbelubricatedwith
anSAEmulti-purpose,high-temperaturegreasewith
high-pressure(EP)performanceorSAEmulti-purpose
lithium-basedgrease.
Thelubricationpointsare:
PTOdriveshaft(3)(Figure27)
g007309
Figure27
Rollerbearings(ProCore864:2;ProCore1298:4)
(Figure28)
g007310
Figure28
Driveshaftbearings(ProCore864:1;ProCore1298:
2)(Figure29)
g007311
Figure29
29

Table of Contents

Related product manuals