Start, Cutting Unit and High Temp. Relays
To test the relay, disconnect the relay wire connector
and install a continuity tester between the relay termi-
nals (terminals 30 and 87). The relay should make and
break continuity at terminals 30 and 87 as 12 V.D.C. is
connected and disconnected to terminal 85 with termi-
nal 86 connected to ground.
1
Figure 15
1. Start relay
1
2
Figure 16
1. Cutting unit relay 2. High temp. relay
Figure 17
Testing P
age 5 - 20 Reelmaster
®
335-D