EasyManua.ls Logo

Toro Workman GTX - Pre-Maintenance Procedures; Preparing the Machine for Maintenance; Lifting the Machine

Toro Workman GTX
64 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Pre-Maintenance
Procedures
PreparingtheMachinefor
Maintenance
1.Parkthemachineonalevelsurface.
2.ShiftthetransmissiontotheNEUTRALposition.
3.Engagetheparkingbrake.
4.Shutofftheengineandremovethekey.
5.Emptyandraisethecargobed.
LiftingtheMachine
DANGER
Themachinemaybeunstablewhenusing
ajack.Themachinecouldslipoffthejack,
injuringanyonebeneathit.
•Donotstartthemachinewhilethemachine
isonajack.
•Alwaysremovethekeyfromthekeyswitch
beforegettingoffthemachine.
•Blockthetireswhenthemachineis
supportedbyliftingequipment.
•Usejackstandstosupportthemachine
onceyouhaveliftedit.
Important:Wheneveryourunthemachinefor
routinemaintenanceand/ordiagnostics,ensure
thattherearwheelsofthemachineare25mm(1
inch)offtheground,withtherearaxlesupported
onjackstands.
•Theliftingpointatthefrontofthemachineis
locatedatthefrontoftheframe,behindthetowing
tongue(Figure23).
g034043
Figure23
1.Frontliftingpoint
•Theliftingpointattherearofthemachineis
locatedundertheaxletubes(Figure24).
32

Table of Contents

Other manuals for Toro Workman GTX

Related product manuals