EasyManua.ls Logo

Toshiba e-STUDIO350 - 4 General Operation; Overview of Operation; Description of Operation; Warming-Up

Toshiba e-STUDIO350
286 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
November 2003 © TOSHIBA TEC 4 - 1 e-STUDIO350/450 GENERAL OPERATION
4
4 GENERAL OPERATION
4.1 Overview of Operation
Operation of equipment Operation during initializing, pre-running and ready
Drawer feed copying by [START] button
Copying operation Bypass feed copying
Interrupt copying
4.2 Description of Operation
4.2.1 Warming-up
(1) Initialization
Power ON
IH coil ON
Set number “1” reproduction ratio “100%” and “WAIT WARMING UP” are displayed
Fan motors ON
Initialization of scanning system
The carriage moves to the home position.
The carriage moves to the peak detection position.
The exposure lamp is turned ON.
– Peak detection (white color is detected by the shading correction plate)
The exposure lamp is turned OFF.
“READY (WARMING UP)” is displayed
(2) Pre-running operation
The pre-running operation is started when the temperature of the fuser roller surface reaches a
certain temperature.
Fuser roller rotated
Drum rotated
The main motor is turned ON.
Initialization of feeding system
– Each drawer tray goes up.
Pre-running operation stops after five seconds.
(3) When the surface temperature of the fuser roller becomes sufficient for fusing,
“READY” is displayed.

Table of Contents

Other manuals for Toshiba e-STUDIO350

Related product manuals