EasyManua.ls Logo

Toshiba MMY-MAP0724HT6UL - Page 91

Toshiba MMY-MAP0724HT6UL
241 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
90
(7-segment display)
Cooling
Heating
Operation
This check operation
requires 15 minutes
even if there is no
misconnection or there
is any misconnection.
No. of misconnected
indoor units
(7-segment display)
(7-segment display)
Address display
of misconnected
indoor unit
(7-segment display)
Operation start
Press the push-switch SW04 on the interface P.C.
board of the header unit for 2 seconds or more. The
operation starts.
Check that 7-segment display [B] shows [ CC] for
cooling and [ HH] for heating.
Confirmation of check results (1)
Check that No. of misconnected indoor units is
displayed on 7-segment display [B] after 15 minutes.
(If there is no misconnection, [00P] is displayed.)
Confirmation of check results (2)
Press the push-switch SW05 on the interface P.C. board
of the header unit for 2 seconds or more. The indoor
address in which error is being detected is displayed on
7-segment display [B]. If there are multiple indoor
address in which error is being detected, they are
successively exchanged and displayed.
(When SW05 is turned on again, the display returns to
display of No. of units.)
After check, return the rotary switches
SW01/SW02/SW03 on the interface P.C. board of the
header unit to [1/1/1].
7-segment display [A]
7-segment display [B]
<Rotary switches>

Table of Contents

Related product manuals