EasyManua.ls Logo

Toshiba RAS-B10J2FVG-E - Page 110

Toshiba RAS-B10J2FVG-E
133 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
No. Part name Procedure Remarks
Turbo fan 1) Turn the flange nut (M10) in the
counter-clockwise direction and take it off.
2) Pull out the turbo fan from the fan
motor shaft.
<Attention for turbo fan assemble>
The tightening torque of the flange nut
is 5N·m.
Fan motor 1) Remove screws for motor holder,
and take off the motor holder.
2) Take off the lead cover.
<Attention for motor holder assemble>
1. Arrange the earth lead and fan
motor lead.
2. Adjust the motor axis to the center
of the motor holder then fix screws 4 pcs.
Fan motor A method to take off a fan motor in a
condition taking on a heat exchanger.
1) Take off pipe holder and remove
screws for heat exchanger. (refer to )
2) Remove screws for the bell mouth.
(refer to )
Screws for motor hold
(4 pcs)
Motor holder
Lead cover
- 110 -

Table of Contents

Other manuals for Toshiba RAS-B10J2FVG-E

Related product manuals