EasyManuals Logo

TP-Link JetStream L2 Installation Guide

TP-Link JetStream L2
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #18 background imageLoading...
Page #18 background image
14
L2 Managed Switch
Connection
Note: The gure is to illustrate the application and principle. The power cord you get
from the package and the socket in your situation will comply with the regulation in
your country, so they may dier from the gure above.
4.6 Initialization
After the device is powered on, it begins the Power-On Self-Test. A series of tests
run automatically to ensure the device functions properly. During this time, its LED
indicators will respond as follows:
The Power LED indicator will light on all the time.
After keeping off for several seconds, the LED indicators of all the ports will flash
momentarily and then turn off again after the initialization.
The System LED indicator will flash, which represents a successful initialization.

Other manuals for TP-Link JetStream L2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the TP-Link JetStream L2 and is the answer not in the manual?

TP-Link JetStream L2 Specifications

General IconGeneral
BrandTP-Link
ModelJetStream L2
CategorySwitch
LanguageEnglish

Related product manuals