EasyManuals Logo
Home>TP-Link>Switch>TL-SG5428

TP-Link TL-SG5428 Installation Guide

TP-Link TL-SG5428
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #9 background imageLoading...
Page #9 background image
04
L2 Managed Switch
Chapter 2 Installation
2.1 Package Contents
Make sure that the package contains the following items. If any of the listed items is
damaged or missing, please contact your distributor.
2.2 Safety Precautions
To avoid any device damage and bodily injury caused by improper use, please observe
the following rules.
Safety Precautions
Keep the power off during the installation.
Wear an ESD-preventive wrist strap, and make sure that the wrist strap has a good
skin contact and is well grounded.
Use only the power cord provided with the switch.
Make sure that the supply voltage matches the specifications indicated on the rear
panel of the switch.
Ensure the vent hole is well ventilated and unblocked.
Do not open or remove the cover of the switch.
Before cleaning the device, cut off the power supply. Do not clean it by the waterish
cloth, and never use any other liquid cleaning method.
Site Requirements
To ensure normal operation and long service life of the device, please install it in an
environment that meets the requirements described in the following subsection.
Temperature/Humidity
ȭ
ȭ
TL-SG5428
Installation
One Resource CD
One Switch
One Power Cord and One
Console Cable
This Installation Guide
Two mounting brackets and
the ttings
TL-SG5428
TL-SG5428

Other manuals for TP-Link TL-SG5428

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the TP-Link TL-SG5428 and is the answer not in the manual?

TP-Link TL-SG5428 Specifications

General IconGeneral
BrandTP-Link
ModelTL-SG5428
CategorySwitch
LanguageEnglish

Related product manuals