CLCH-SVX07C-EN 31
Installation - Mechanical
For parallel-to-airflow channels, size channels based on a four-point load distribution (see
Figure 13.
For perpendicular-to-airflow channels, size channels based on the load distribution of the
individual sections and install the channels so that both ends of every section are supported
(see Figure 14).
Using Integral Base Frame
If using the factory-provided integral base frame for ceiling suspension, individual sections and/
or subassemblies will have base frame shipping splits and base frame lifting lugs. When using the
base frame for ceiling suspension:
Suspend the unit (on both sides of the unit) at each shipping split lug as well as the four corners
of the unit (see Figure 15). See Figure 7 and Table 8 on page 27 for lug hole sizes.
Bolt shipping splits together.
Note: The hanger rods must extend through the bottom of the base lug. It is the building
engineers responsibility to provide the appropriate hangers.
Figure 13. Typical suspension method using parallel
channels
Figure 14. Typical ceiling suspension using perpendicular
channels
Figure 15. Ceiling suspension for unit sizes 3-57
Hole diameter
is 0.625 inches

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Trane TAM4A0C48S41SB and is the answer not in the manual?

Trane TAM4A0C48S41SB Specifications

General IconGeneral
BrandTrane
ModelTAM4A0C48S41SB
CategoryAir Handlers
LanguageEnglish

Related product manuals