EasyManua.ls Logo

Trane Voyager III - General Information; About This Manual; Tools Required for Installation

Trane Voyager III
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 PART-SVN121A-EN
General Information
About This Manual
The step-by-step instructions outlined in this manual describe the procedures required to
successfully retrofit a TR1 on 20 ton to 150 ton IntelliPak™ I and II rooftop air conditioning and 27½
to 50 ton Voyager™ III rooftop air conditioning units to a Trane TR200 VFD drive. For help selecting
the proper parts for this work, refer to general service bulletin PART-SVB24A-EN or the most current
version of that same literature.
The installation instructions in this manual are divided into three general topic areas:
Removal of existing TR1 VFD and components.
Installation of replacement TR200 VFD and components.
TR200 programming of parameters.
Follow start-up and trouble shooting procedures outlined in the service manuals of the unit and/
or the literature that is included with this TR200 control.
Tools Required
Very few tools are required to perform this installation. A service technician with a well-stocked tool
chest should have the right tools to perform the job; However, a large-frame VFD will require a
crimping tool for ring lugs and a drill with a #21 (4mm) drill bit sized to allow a #10-32 screw to
thread into sheet metal.

Related product manuals