2.5 Coastal Considerations
STEP 2 - To remove the unit from the pallet,
remove tabs by cutting with a sharp tool.
Section 3. Unit Preparation
3.1 Prepare The Unit For Installation
STEP 1 - Check for damage and report prompt-
ly to the carrier any damage found to the unit.
Section 4. Setting the Unit
4.1 Pad Installation
When installing the unit on a support pad, such
as a concrete slab, consider the following:
The pad should be at least 1” larger than the
unit on all sides.
The pad must be separate from any structure.
The pad must be level.
The pad should be high enough above grade
to allow for drainage.
The pad location must comply with National,
State, and Local codes.
If installed within one mile of salt water, including seacoasts and inland waterways, models without factory sup-
plied Seacoast Salt Shields require the addition of BAYSEAC001 (Seacoast Kit) at installation time.

Other manuals for Trane XR13

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Trane XR13 and is the answer not in the manual?

Trane XR13 Specifications

General IconGeneral
Sound Level74 dB
RefrigerantR-410A
StagesSingle-stage
SEER14
HSPF8.2
CompressorSingle-stage
Cooling Capacity1.5 - 5 tons
Warranty10 year limited warranty on compressor