EasyManuals Logo

Trane XR13 User Manual

Trane XR13
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #9 background imageLoading...
Page #9 background image
18-BC83D1-2 9
STEP 2 - Remove the pressure tap cap and
valve cores from both service valves.
STEP 3 - Purge the refrigerant lines and indoor
coil with dry nitrogen.
STEP 4 - Wrap a wet rag around the valve
body to avoid heat damage and continue the
dry nitrogen purge.
Braze the refrigerant lines to the service
valves.
Continue the dry nitrogen purge. Do not re-
move the wet rag until all brazing is completed.
Important: Remove the wet rag before stopping
the dry nitrogen purge.
NOTE: Precautions should be taken to avoid
heat damage to basepan during brazing. It is
recommended to keep the flame directly off of
the basepan.

Other manuals for Trane XR13

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Trane XR13 and is the answer not in the manual?

Trane XR13 Specifications

General IconGeneral
Sound Level74 dB
RefrigerantR-410A
StagesSingle-stage
SEER14
HSPF8.2
CompressorSingle-stage
Cooling Capacity1.5 - 5 tons
Warranty10 year limited warranty on compressor

Related product manuals