EasyManua.ls Logo

TSI Instruments SidePak AM520 - Page 65

TSI Instruments SidePak AM520
98 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance
49
1. When using the cyclone, be sure that there is no impactor disk
installed. Use the standard inlet (unmarked) with gasket.
2. Attach the Dorr-Oliver
cyclone to the DPM
cyclone to create the
DPM assembly.
3. Attach the DPM
cyclone assembly
and sample tube
onto the inlet.
4. Adjust the flow rate to 1.7 L/min.
See Chapter 3, “Operation for
instructions on how to set the
flow rate.
TSI 4146 flow meter (sold separately) being
used to calibrate flow setting
The SidePak monitor and DPM cyclone assembly are now ready
to use. Attach the DPM cyclone assembly to the individual test
subject's clothing using the U-tube and clip provided with the DPM
cyclone assembly.

Table of Contents

Related product manuals